dry cleaning machine
1. The name and type of the machine.
GX Dry Cleaning Machine
2. Function, feature of the machine.
Steaming, heating, good drying effect.
High rate of detergent refrigeration recovery.
No harm, no color-fading and no crumple will be seen when nylon, silk, chemical fabric, fur coat, feather coat and cotton fabric are washed.
It can be widely used in hotels, restaurants, dry cleaner, hospitals, industrials and mining enterprises, troops, airports and ocean liner.
It has high quality recycle working system, including filter, still tank, still cooler, water separator and cleaning tank, which can save solvent (perchloroethylene), more than 99.8% solvent can be recycled, no pollution to the air, no harm to human, keep the room fresh.
High-speed fan can speed up the drying and cooling rate
Three bottom tanks separate clean, dirty and working solvent, which can avoid mixing the solvent.
Main parts with high quality stainless or non-ferrous metals stamping with a mold crafted, using high-temperature galvanizing technology to greatly increase the corrosion resistance of the machine.
3. Specification
MODEL |
GX-6 |
GX-8 |
GX-10 |
GX-12 |
GX-14 |
Capacity (kg) |
6 |
8 |
10 |
12 |
14 |
Volumn (L) |
108 |
150 |
180 |
200 |
230 |
Washing Speed (r/min) |
48 |
48 |
48 |
48 |
48 |
Extracting Speed (r/min) |
480 |
480 |
480 |
480 |
480 |
Drying Time (min) |
45-60 |
45-60 |
45-60 |
45-60 |
45-60 |
Distillation Rate (Uh) |
60 |
80 |
98 |
110 |
110 |
Noise (dB) |
61 |
75 |
75 |
75 |
75 |
Power (AC/V) |
220/380 |
220/380 |
220/380 |
220/380 |
220/380 |
Weight (kg) |
900 |
1200 |
1350 |
1400 |
1500 |
Dimension (mm) |
1350×750×1800 |
1500×1050×1800 |
1500×1100×1800 |
1800×1150×1950 |
1800×1150×1950 |
Cooling Water Pressure(MPa) |
0.2-0.3 |
0.2-0.3 |
0.2-0.3 |
0.2-0.3 |
0.2-0.3 |
Cooling Water Inlet (inch) |
1/2 |
1/2 |
1/2 |
1/2 |
1/2 |
4. Documentation
1)Operational manual with English will be given at the time of dispatch of machine.
2)All our machines guaranteed for trouble free performance for a period of 12 months from commissioning.
3)Copy of ISO 9001 and CE certificate.
5. Delivery data and service after sell
1) Payment Terms
T/T 30% in advance, 70% before delivery.
2) Delivery Date
15-30 days upon your order Qty
3) Service After Sell
Installation and service after sell for free for one year, and with spare parts for one years. The air ticket from china to Client’s and Client’s to china will be paid by the buyer and the buyer should supply our engineer’s room and food!